April 15, 2013, was the grand opening for a new Starbucks on the corner of 2nd and Cherry, in Seattle’s Pioneer Square neighborhood! It’s an area of Seattle where a very large number of the buildings are designated as historic structures. The plaque on the 2nd and Cherry Building names it the “Roderick Building” and indicates it was constructed in 1894. It’s not far from the historic Smith Tower building, which has a viewing room that has the “Chinese Chair” in it. Supposedly, you can make a wish in the chair! By the way, the Collins pub just down the street (at Second and James – 526 Second Avenue) has really wonderful food. I have eaten there many times!
I just wanted to introduce you to this new store and its neighborhood. From what I have heard, this is not the final design for this store. Starbucks did a quick conversion from a Seattle’s Best to a Starbucks. The store will undergo remodeling while functioning as a Starbucks, all the while. As I understand it, later in the year, it will have an official re-launch as a Clover Starbucks.
Here’s the exact address:
Starbucks
621 Second Avenue
Seattle, WA 98104
(206) 682-7726
Drop by and say hello to the team at 2nd and Cherry!
Related posts
4 Comments
Leave a Reply Cancel reply
You must be logged in to post a comment.
Sponsors
Recent Comments
- DEVIN on Compostable Straws Land in Seattle Starbucks Stores
- coffeebeanz on Why do you go to Starbucks less often? (If that’s true for you)
- Willi on You can now buy a Siren statue: $6,000
- Willi on A major revamp of your drink recipe: Testing syrup extracts and cane sugar
- Skip on Why do you go to Starbucks less often? (If that’s true for you)
Very impressive store and like the windows looking out into the street. How large is it? Just curious why are they doing another remodel? To make it clover friendly?
The store is totally new as a Starbucks. Before it was a Starbucks, there was a Seattle’s Best in that location. So they did a quick turn around because it was already a coffeehouse set up. But this look isn’t as ideal as it could be and is not Clover friendly. so now comes the second phase of construction, then a re-laucnh with the Clover. Good question.
That phone number is incorrect. The correct one is: (206) 682-7726
Oh shoot! Thank you for catching that. I will fix it right now.